HDD DRILLING IN WEESP – INSTALLATION OF RESIDENTIAL POWER NETWORK

Van Leeuwen Sleufloze Technieken executed horizontal directional drilling (HDD) crossing under the A1 motorway. Foreman driller Oscar van Beek and his team were responsible.

TECHNICAL SPECIFICATIONS

Client

Van Gelder Kabel,- Leiding- en Montagewerken
Implementation period
March 2024

Bore Lenght

715 m

Bore Cross-section

3 x Ø125 casing pipes

Activities

Starting at the P+R alongside the motorway, they drilled a 715 m long trajectory for 3 x Ø125 casing pipes. These pipes will connect a new residential estate in the Bloemendalerpolder to the power network. There were no delays or any other unexpected circumstances, resulting in the project being completed according to schedule.
Special Circumstances
This drilling work was executed under the A1 motorway.