'innovators
by nature'

TWO DRILLINGS LEIPZIG

Close to Leipzig, we carried out two drillings with our Herrenknecht AG 250 tonner for Ferngas Netzgesellschaft MbH. This concerned a gas compound EGL 442.

TECHNISCHE SPECIFICATIES

Opdrachtgever

Ferngas Netzgesellschaft MbH

Uitvoeringsperiode

June 2020

Lengte boring(en)

240 m en 435 m

Doorsnede boring(en)

DN500 steel | Rocktooling due to 50mpa conditions | First clearing Ø 400 mm | Second clearing Ø 700 mm

Werkzaamheden

Bijzonderheden

VIDEO