DIRECTIONAL DRILLING IN DRIEBRUGGEN
In Driebruggen, we installed a casing pipe for the construction of an LV cable.
TECHNICAL SPECIFICATIONS
Client
Van Schie
Implementation period
February 2018
Bore Lenght
27 m
Bore Cross-section
Activities
This casing pipe was installed by means of directional drilling over a length of 27 metres.
Special Circumstances