Commissioned by and in collaboration with BAM Infra Energie & Water, Van Leeuwen Trenchless Technology successfully completed at Grasweg Amsterdam, to the full satisfaction of client Waternet.

TECHNICAL SPECIFICATIONS

Client

BAM Energie & Water / Waternet
Implementation period
February 2018

Bore Lenght

770 m

Bore Cross-section

SLA 3.0 HDPE ø 500 mm

Activities

In this project, a trajectory of 770 metres of SLA 3.0 HDPE ø 500 mm drinking water pipeline was installed using the HDD drilling technique.
Special Circumstances
The installation operation required the combined efforts of 11 telescopic cranes and a number of mobile caterpillar cranes. By suspending the pipeline in a supple arched shape, it could be pulled in place in a controlled manner above the cycle path and access roads. The installation operation was successfully completed with the required pulling power of max. 10 tons.