LARGE AND SMALL HDD WORKS IN DRACHTEN
In Drachten, we conducted 8 HDD drilling works for sewage water pressure pipelines.
TECHNICAL SPECIFICATIONS
Client
Pannekoek GWW
Implementation period
Bore Lenght
5 km
Bore Cross-section
1x Ø400mm
Activities
The total length of the route is approximately 5 kilometres.
Special Circumstances
Four drilling units were deployed simultaneously in order to minimise hinder and complete the project as quickly as possible. Van Leeuwen Trenchless Technology was also responsible for designing a number of drilling works.